CONSTRUCTION
Valcorp Enterprises takes on every project and offers innovative solutions with a combination of over 20 years of experience in effective project management.
Services
General Construction
Overhead Doors
Crane info
Steam Traps
Power Generator
general construction
We strive to provide solutions to your project needs, utilizing specialized project management techniques to oversee the planning, cost, and quality of the project scope. Maximizing the function of resources efficiency through the procurement of labor, materials, and equipment.
Services:
- Military Facility Building
- Concrete
- Roofing
- HVAC
- TDLR- Licensed Electrician
License #36186 Exp. 07/01/2022
Primary NAICS Codes
236210 – Industrial Building Construction
236220 – Commercial & Industrial Building Construction
238990 – All Other Specialty Trade Contractors
238110 – Poured Concrete Foundation and Structure Contractors
238160 – Roofing Contractors
238210 – Electrical Contractors and Other Wiring Installation Contractors
238220 – Plumbing, Heating and Air-Conditioning Contractors
238320 – Other Building Equipment Contractors
531120 – Lessor of Nonresidential Buildings (except Mini-Warehouses
Past Performance
- 301st AF – TX
- 136th TXANG – TX
- 7 CONS LGC – TX
- 82 CONS – TX
- Federal Bureau of Prisons – TX/OK
- USDA – Natural Resource Conservation Service – TX/GA
- NAVFAC SE – TX
- Supply Core – TX
- USPFO – RI
- Dept of Veterans Affairs – TX/WY/AK/KS
OverHead Doors
Overhead doors services include but are not limited to:
- Installation
- Repairs
- Preventative Maintenance
PAST PERFORMANCE
- NASJRB Fort Worth (both AFand Navy)
- USACE – Ft. Worth
- Department of VeteransAffairs (Bonham/Sheridan)
- Federal Bureau of Prisons
- Dyess/Sheppard AFB•USDA – National Resource Conservation Service

cRANES
Crane and elevator services include but are not limited to repairs, maintenance, and modernization.
- Annual/ Monthly Inspections
- Monthly PM Schedules
- Load Testing
PAST PERFORMANCE
- 301st AF Fort Worth, TX
STEAM TRAPS
Valcorp Enterprises takes on every project and offers innovative solutions with a combination of over 20 years of experience in effective project management.
SERVICES PROVIDED
- Steam Trap Survey and Inspection Services
- Steam Trap Replacement
- Energy Savings and Energy Management Solutions
GOALS FOR STEAM TRAP SURVEY/INSPECTION/REPLACEMENT ARE AS FOLLOWS:
- Restore any lost function by failed traps
- Reduce energy loss due to high temperature condensate return that must be purged from the system due to traps failed open
- Damage to components of the system by carbonic acid when traps fail in the closed position causing subcooling in the steam line
Our very extensive survey and inspection will identify all of these issues and compile a comprehensive report which can then be used on a collaborative basis between Valcorp and the customer to determine the traps that NEED to be replaced, and only replace those traps.
A major part of the disconnect with these projects is the “educated guess” by the customers as to the number of traps that need to be replaced. There is no effective way of knowing which traps need to be replaced without a good inspection. This drives up your cost of these projects as the traps to be replaced is based on a somewhat arbitrary number and reduces potential ROI.
VALCORP ENTERPRISES INCORPORATES A TWO-PHASE APPROACH TO THESE PROJECTS:
First Phase:
A complete survey and inspection. This is a fixed cost but will identify the actual issues that exist. Then with our full report and collaboration, our customers can make an educated decision (and an accurate budget) of the work that needs to be done. We rank the critical nature of the replacement, by trap, on a 1-5. Depending on budgeting, you may only want to address the critical traps, but this can all be done based on the number, the ROI of each trap replacement.
Second Phase:
Change out the traps that are critical and we will get you the ROI based on whatever budget constraints may exist. We would like to assist in this area as well as a CO/MOD to the survey and inspection contract when you deem appropriate.
Our belief is that if you were to perform these two phases (the first being a fixed price and the second a variable, but based on actual information), you will maximize your ROI.
Average Energy Loss Per Failed Trap on an Annual Basis:
- 100psi Float/Thermostatic Trap .125” orifice
- Steam loss through a failed trap 43.4#/Hr
- 60% loss estimate
- Cost calculated at $/1,000lbs of steam
- $10/1,000#
- SINGLE TRAP ENERGY LOSS PER YEAR $3,802!
PLEASE CONTACT US FOR A PRICING SHEET WHICH WILL ALLOW YOU TO BUDGET FOR THE TWO PHASES OF YOU STEAM SYSTEM SOLUTION.
PAST PERFORMANCE
- VA Bonham, TX
- VA Sheridan, WY
- VA Tucson, AZ
- VA Tampa Bay, FL
- VA West Haven, CT
- VA Newington, CT
pOWER gENERATION
Valcorp provides a variety of services to assist with on-site power generator needs and requirements.
SERVICES PROVIDED
- New Generator Installations
- Generator Replacements
- Generator Rentals
- Generator Repairs/Maintenance Contracts
- Competent in JCAHO Compliance
- Load Bank Testing
PAST PERFORMANCE
- VA Temple, TX
- VA Waco, TX
- USDA-NRCS Fort Worth, TX
- USDA-NRCS Americus, GA
- USDA-NRCS Knox City, TX
- 301st AF Fort Worth, TX

